Ottawa Apartments for Rent
Would you like to react to this message? Create an account in a few clicks or log in to continue.

21.5km North-South Corridor to be Up and Ready in 2026

Go down

21.5km North-South Corridor to be Up and Ready in 2026 Empty 21.5km North-South Corridor to be Up and Ready in 2026

Post  propertylaunchguru Wed May 25, 2016 7:21 am

Singapore's 21.5km North-South Corridor to be Up and Ready in 2026 which is Singapore's premier superhighway to have dedicated bus lanes and biking route. The plan was initially announced as vehicular expressway to be up and running by 2020, but it was ultimately changed last January, that the highway be built as Singapore's first consolidated transport corridor.

The project is established to link the north towns to the city in the next months and calls for invitation to tender for planned corridor. The stellar structure for the 1st incorporated transport corridor on the expressway will begin in 2017, as adverted by the Land Transport Authority (LTA).

propertylaunchguru

Posts : 763
Join date : 2012-09-12

Back to top Go down

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum